8TH STREET INTERCEPTOR SEWER
This project consists of the installation of a new gravity main to be constructed along 8th Street North between 95th Avenue North and 110th Avenue North. A gravity main sewer is a pipe that moves water without pressure. In addition to the installation of the new gravity sewer, the County may repair and replace water, wastewater and stormwater systems that service this area. Stormwater collection and treatment system rehabilitation work will take place in the right of way.
Contractor: To be determined
Cost: To be determined
Anticipated construction commencement: 2017
Anticipated construction completion: 2018
The projects listed below represent the Basin 101 projects that are currently under construction, design development or early planning stages. Additional projects will be added to this page as new projects are identified and developed within Basin 101 program area.