105th and 106th AVENUE NORTH PUBLIC UTILITY RENEWAL PROJECT
This project is part of the Naples Park Utility Renewal Project and includes the removal and replacement of water, wastewater and stormwater infrastructure that services residents and businesses along 105th and 106th Avenues North between Tamiami Trail and Vanderbilt Drive. As part of the improvements, the contractor will be replacing water and wastewater service lines. Clay wastewater pipe laterals from the property will be replaced with new PVC pipe. This work may need to take place on private property and permission from the owner will be necessary. Stormwater collection and treatment system rehabilitation work will take place in the right of way. This project will also improve the ability to collect wastewater from Basin 101 for conveyance to the treatment facility to prevent overflows and ensure a continued high level of wastewater service to the community.
PROJECT PROGRESS UPDATE
May 17, 2023
The contractor finished installation of new 8-inch PVC water main, fire hydrants and water services along the entirety of 106th Avenue North. The contractor also finished water services, water meters, and backflow preventers along the 500 and 600 block of 105th Avenue North. The existing asbestos-cement water mains along the 500 block of both streets and half of the 600 block of 106th Avenue North were also removed and the contractor tied-in the existing 12-inch water main to the new water main at 105th Avenue North and 6th Street North.
The contractor finished installation of sanitary sewer main and laterals along the 500 block and half of the 600 block of both streets. The contractor also finished stormwater drainage installation along the 500 block of 106th Avenue North and continued stormwater drainage installation along the 500 block of 105th Avenue North and 600 block of 106th Avenue North, which is anticipated to continue through the month of May. Road restoration activities also continued along the 500 block of 106th Avenue North.
SYSTEMS INSTALLATION PROGRESS UPDATE
May 17, 2023
105th Avenue North
Water System | Wastewater Sewer System | Stormwater System | ||||
---|---|---|---|---|---|---|
Block | New Water Pipe Installation | Old Water Pipe Removal | New Sewer Main Installation | New Sewer Laterals Installation | Stormwater Installation | Restoration |
500 | 100% | 100% | 100% | 100% | 65% | 0% |
600 | 100% | 0% | 50% | 50% | 0% | 0% |
700 | 0% | 0% | 0% | 0% | 0% | 0% |
800 | 0% | 0% | 0% | 0% | 0% | 0% |
106th Avenue North
Water System | Wastewater Sewer System | Stormwater System | ||||
---|---|---|---|---|---|---|
Block | New Water Pipe Installation | Old Water Pipe Removal | New Sewer Main Installation | New Sewer Laterals Installation | Stormwater Installation | Restoration |
500 | 100% | 100% | 100% | 100% | 100% | 10% |
600 | 100% | 50% | 50% | 50% | 45% | 0% |
700 | 100% | 0% | 0% | 0% | 0% | 0% |
800 | 100% | 0% | 0% | 0% | 0% | 0% |
Contractor: DN Higgins, Inc
Cost: $16,767,410.00
Construction commencement date: January 2023
Anticipated construction completion date: April 2024
The projects listed below represent the Basin 101 projects that are currently under construction, design development or early planning stages. Additional projects will be added to this page as new projects are identified and developed within Basin 101 program area.
(CPS – Community Pump Station)